Guidelines for compensation - Right of Way
On the basis of recommendations made by the committee constituted by Ministry of Power in 2015, the guidelines have been formulated for determining the compensation towards the damages in regard to Right of Way (RoW) for laying down the transmission lines in the country. The compensation is only payable for transmission lines supported by a tower base of 66 kV and above.