The Gujarat Electricity Regulatory Commission has issued the Multi Year Tariff regulations dated 29th March 2016. The regulation is effective from April 1, 2016 to March 31, 2021. The primary purpose of these regulations is to determine the tariff in all cases covered under these Regulations.
GERC MYT Regulations 2016
[Clause 2.20]
Gas Insulated Substation (GIS)/Hybrid sub-station – 35 years
Transmission line (including HVAC & HVDC) - 35 years
[clause 2.62]
b. Variation in Interest and Finance Charges, Return on Equity, and Depreciation
c. Variations in performance parameters
d. Variations in interest on working capital
e. Variations in labour productivity
f. Variation in Operation &Maintenance expenses
g. Bad debts written off
[clause 22.2]
b. Change in law
c. Transmission Loss
d. Variation in market interest rates
e. Taxes and Statutory levies
f. Taxes on Income
g. Income from realisation of bad debts written off
[clause 22.1]
2. The balance amount, which will amount to two-thirds of such gain, may be utilised at the discretion of the Transmission Licensee
3. One-third of the amount of such loss may be passed on as an additional charge in tariffs over such period as may be stipulated in the Order of the Commission
4. The balance amount of loss, which will amount to two-thirds of such loss, shall be absorbed by the Transmission Licensee
[clause 24]
(i) For full recovery of annual transmission charges:
(a) AC system : 98 per cent;
(b) HVDC bi-pole links and HVDC back-to-back stations : 95 per cent;
(ii) For Incentive consideration:
(c) AC system : 98.5 per cent;
(d) HVDC bi-pole links and HVDC back-to-back stations : 96 per cent
Recovery of annual transmission charges below the level of target availability shall be on pro rata basis. At zero availability, no transmission charges shall be payable
2. For new HVDC stations, Target Availability shall be considered as 95% for first three years of operations for the purpose of incentive.
3. For AC system, two trippings per year shall be allowed, and after two trippings in a year, additional 12 hours outage shall be considered in addition to the actual outage
4. In case of outage of a transmission element affecting evacuation of power from a generating station, outage hour shall be multiplied by a factor of 2
[clause 67]
FY 2016-17 - Rs. 7.6 lakh/bay
FY 2017-18 - Rs. 8.04 lakh/bay
FY 2018-19 - Rs. 8.50 lakh/bay
FY 2019-20 - Rs. 8.98 lakh/bay
FY 2020-21 - Rs. 9.50 lakh/bay
2. O&M expense/ckt km:
FY 2016-17 - Rs. 0.64 lakh/ckm
FY 2017-18 - Rs. 0.68 lakh/ckm
FY 2018-19 - Rs. 0.72 lakh/ckm
FY 2019-20 - Rs. 0.76 lakh/ckm
FY 2020-21 - Rs. 0.81 lakh/ckm
[clause 68.2.1]
2. In case of competitively awarded transmission system projects the annual transmission charges shall be as per the annual Transmission Service Charges (TSC) quoted
[clause 65]
basis in the ratio of their respective contracted transmission capacities to the total contracted transmission capacity, in accordance with the following formula:
ATCn = (Transmission ARR x CCn÷SCC) ÷ 12
where,
ATCn = annual transmission charges payable by the nth long-termuser or medium-term user of the transmission system
CCn = capacity contracted in MW by the nthlong-term user or medium-termuser of the transmission system
SCC = sum of capacities contracted in MW by all long-term users andmedium-term users of the transmission system
2. The short-term users of the transmission system shall pay transmission charges on Rs/MW/day basis, in accordance with the following formula:
TC (Rs/MW/day) = (Transmission ARR÷SCC) ÷365
Where,
TC (Rs/MW/day) = transmission charges payable by the short-termuser of the transmission system;
Transmission ARR = Aggregate Revenue Requirement of the Transmission Licensee
SCC = sum of capacities contracted in MW by all long-term users andmedium-term users of the transmission system
3. For short-term collective transactions through power exchanges, Transmission Charges shall be denominated in Rs/kWh terms, in accordance with the following formula:
TC (Rs/kWh) = Transmission ARR÷Total units wheeled,
Where,
TC (Rs/kWh) = Transmission Charges payable in the case of short-termcollective transactions through power exchanges;
Transmission ARR = Aggregate Revenue Requirement of the Transmission Licensee.
Total units wheeled = total energy units wheeled through thetransmission system, which shall be equal to the total energy input into the intra-State transmission system during the financial year
[clause 72]
[clause 75]
target availability in accordance with the following formula:
Incentive = ATC x [Annual availability achieved – Target Availability]/ Target Availability
Where;
ATC= Annual Transmission Charges of the Transmission Licensee for the concerned year
Incentive shall be shared by the long-term and medium-term customers in the ratio of their average allotted transmission capacity for the year
No incentive shall be payable for availability beyond 99.75%
[clause 73]
b. dated August 18, 2018
TC (Rs/kWh) = Transmission ARR÷Total units wheeled,
Where,
TC (Rs/kWh) = Transmission Charges payable in the case of short-termcollective transactions through power exchanges;
Transmission ARR = Aggregate Revenue Requirement of the Transmission Licensee.
Total units wheeled = total energy units wheeled through the transmission system, which shall be equal to the total energy input into the intra-State transmission system during the financial year