Tariff Regulations

Uttarakhand

The Uttarakhand Electricity Regulatory Commission has issued the Terms and Conditions for Determination of Multi Year Tariff regulations dated 14th September 2018. The primary purpose of these regulations is to determine the tariff of generating companies, transmission & distribution licensees as per these Regulations from 1st April, 2019 onwards.

UERC MYT Regulations, 2018

Download Principal Document  
Resolution By
UERC
Notification No. and date
No. F-9(29)/RG/UERC/2018/852 dated September 14, 2018
Objectives
For determination of tariff in all cases covered under these Regulations from 1st April, 2019 onwards
Regulations called as
Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018
Effective Control period
April 1, 2019 to March 31, 2022 [clause 5]
Cut-off Date
31st March of the year closing after two years of the year of commercial operation of the project [clause 3.19]
Commercial Operation Date (COD)/ Date of commercial operation
In case of a transmission system, COD means the date declared by the Transmission Licensee from 0000 hour of which an element of the transmission system is in regular service after successful trial operation for transmitting electricity at rated voltage.
[clause 3.20 (c)]
Useful Life
AC and DC sub-station- 25 years
Gas Insulated Substation (GIS) – 25 years
Transmission line (including HVAC & HVDC) - 35 years
Controllable Factors
1. Variations in capital expenditure
2. Efficiency in the implementation of a project not attributable to an approved change in scope of such project
3. Variations in technical and commercial losses
4. Bad debts
5. Variations in performance parameters
6. Variations in working capital requirements
7. Failure to meet the standards specified in the UERC (Standards of Performance) Regulations, 2007
8. Variation in financing pattern
9. Variation in quality of supply; Variation in operation & maintenance expenses
[clause 12.6]
Un-controllable Factors
1. Force Majeure events
2. Change in law
3. Economy wide influences
[clause 12.5]
Sharing Norms
The approved aggregate gain and loss to the Applicant on account of controllable factors shall be dealt with in the following manner:
a. 1/3rd of such gain or loss shall be passed on as a rebate or allowed to be recovered in tariffs
b. The balance amount of such gain or loss may be utilized or absorbed by the Applicant
[clause 14]
Norms of operation
The norms of operation, subject to modifications thereof from time to time, shall be as under:
(1) Auxiliary Energy Consumption in the sub-station
a. AC System- The charges for auxiliary energy consumption in the AC sub-station for the purpose of air-conditioning, lighting, consumption, etc. shall be borne by the Transmission Licensee and shall be separately claimed by the licensee under the operation and maintenance expenses.
(2) Target Availability for recovery of full transmission charges
(a) AC System : 98%
Recovery of fixed charges below the level of target availability shall be on pro-rata basis. At zero availability, no transmission charges shall be payable
[clause 61]
Operation & Maintenance expenses
The O&M expenses for the first year of the Control Period shall be approved by the Commission taking into account the actual O&M expenses for last five years till Base Year
subject to prudence check by the Commission
The O&M expenses for the nth year and also for the year immediately preceding the Control Period i.e. FY 2017-18 shall be approved based on the formula given below:-
O&Mn = R&Mn + EMPn + A&Gn
Where –
O&Mn – Operation and Maintenance expense for the nth year;
EMPn – Employee Costs for the nth year;
R&Mn – Repair and Maintenance Costs for the nth year;
A&Gn – Administrative and General Costs for the nth year
[clause 62]
Allocation of Annual Transmission Charges
The transmission charge (inclusive of incentive) payable for a calendar month for AC system or part thereof shall be computed in accordance with the following
equation:
a) For TAFM ≤ 98%
ATC x (NDM/NDY) x (TAFM/98%)
b) For TAFM: 98%< TAFM ≤ 98.5%
ATC x (NDM/NDY) x (1)
c) For TAFM: 98.5%< TAFM ≤ 99.75%
ATC x (NDM/NDY) x (TAFM/98.5%)
d) For TAFM ≥ 99.75%
ATC x (NDM/NDY) x (99.75%/98.5%)
Where,
ATC = Annual Transmission Charge specified for the year in Rupees
NATAF = Normative annual Transmission availability factor, in per cent
NDM = Number of days in the month
NDY = Number of days in the year
TAFM = Transmission System availability factor for the month, in percent
The monthly Transmission Tariff as determined by the Commissions hall be shared by all long-term and medium-term open access customers on monthly basis in the ratio of their allotted capacities
[clause 65]
Treatment of losses
The energy losses in the transmission system of the Transmission Licensee, as determined by the State Load Despatch Centre and approved by the Commission, shall be borne by the Transmission System Users pro-rata to their usage of the intra-State transmission system
[clause 67]
Corrigendum/ Amendment, if any
a. dated 26 November 2020
UERC Tariff Regulations, 2018 (1st Amendment)

Resolution By
UERC


Notification No. and date
No. F-9(29)(I)/RG/UERC/2020/923 dated 26 November 2020


Objectives
For determination of tariff in all cases covered under these Regulations from 1st April, 2019 onwards


Regulations called as
Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2020


Effective Control period
April 1, 2019 to March 31, 2022


Cut-off Date
No amendment


Commercial Operation Date (COD)/ Date of commercial operation
No amendment


Useful Life
No amendment


Controllable Factors
No amendment


Un-controllable Factors
No amendment


Sharing Norms
No amendment


Norms of operation
No amendment


Operation & Maintenance expenses
No amendment


Payment of Transmission Charges
No amendment


Allocation of Annual Transmission Charges
No amendment


Treatment of losses
No amendment


Incentive
No amendment


Reactive Energy Charges
No amendment


Corrigendum/ Amendment, if any
k. rebate eaned on discharge of power urchase liabilities
l. late payment surcharge on account of delayed discharge of power purchase liabilities
[clause 12.6]